2021 Atelier Waste Pipes
When the main house roof was fixed, we then noticed an issue with the toilet in the Atelier. Upon further investigation we found a several challenges.
- The machinery used to lift the material up to the roof had crushed the sewage pipes.
- The shower tray was not actually connected to the waste pipe.
- The shower water if it actually arrived in the pipe, plus the sink and the washing machine water were all going directly into the rain water drainage out to the front and not the fosse-septic.
- When the new sewage pipe was laid, we discovered the rain water drainage from the side entrance was going directly into the fosse.
Repairs

Investigating the Pipe Work
Daniel and Harry/Hugo locating the waste pipes.

The Crushed Pipe
It would not be the only one.

Waste Pipes Connected
We discovered a plastic thing (green). It remains a mystery.

Covered and Protected
Hopefully we don't see these again for a very long time.

Turn the Corner
No 90 degree bend, please!

New Waste Pipe
Slowly the waste pipes and rain water drainage at the front gets organised.

Covering with Blue Mesh
The pipes have to be protected and act as a warning for future miners.

Covering
The pipes have to be protected.

Done
But a bit of a mess, until we recovered all the paths and drives.
Inside the Atelier

The Shower Tray
We had to break the shower tray, later Sebastian would replace it.

Taps etc for the Sink Unit
The unit had to be removed and later reconnected to the new waste pipes.