2022 Gite
The roof of the Gite took much longer than anticipated. It remained open to the elements for more than six months resulting in the original internal walls growing mould and rotting.
We may have saved the doors, we shall see. We also dug up the concrete floor and saved a collection of original tiles, that hopefully we may be able to reuse.
The removal of the plaster also revealed a huge stone behind the fireplace and also made it clear that there was once an entrance between the two windows.
Compare


Before

Entrance Room
This is where we found the grandfather-clock case.

Entrance to 1st Room

1st Room
Here you can see the nice tiles.

2nd Room
Here we found two nice side-boards.

The Corridor
By the way we also had to brink up the door, as the lintel was risky.
Damp

Lovely and Green

A Bit more Green
Demolition




Floor Removal

Uncovering the Tiles

Step by Step

Getting There

Back-Breaking Work

Keeping it Tidy
Finished

Left End of the Gite

Windows and Door

The Fireplace Stone Left View

The Fireplace Stone