2022 Renovations

From 2022 onwards we could take a little break and focus on improving quality-of-life experiences.

We continued with decoration, notibly the staircase.

We also tidied up the whole outside experience, especially the drive to the gite and the gravel paths. This made a huge change.

Of course, it was the clean up of the Gite that took the focus in early 2022. The roof had been missing for 6 months. The insides were in terrible condition. It need gutting, literally.

Decorating the Staircase

The staircase had taken a beating after the attic was renovated.

Decorating the Living Room

The previous owners smoked and the walls had nicotine stains. The floor around the fireplace was also in need of attention.

Driveway and Paths

After all the drainpipe and waste pipe works the paths and driveway were in poor condition.

Gite

It remained open to the elements for more than six months resulting in the original internal walls growing mould and rotting.

Waste pipes to the Fosse

Another crushed pipe

Front Wall

The front wall was basically a pile of rubble in the garden and the front was simply a wild hedge.

Paths and Driveway

After all the drainpipe and waste pipe works the paths and driveway were in poor condition.

Side Entrance

Was a real mess and needed tidying.

Garden Well

The new-look drive and gravel made the well look very sad and the wood was rotten.

Decorating the Bathroom

The master bathroom was affected by the installation of the ensuite and the bathroom above, in the attic.